November Progress

Posted on December 1, 2016. Filed under: Monthly progress |

Here’s the first published picture of a Far North passenger train passing through the model Culrain.

highland-railway-journal-119-cover

The train is the morning Helmsdale to Inverness with the previous day’s northbound TPO immediately behind the engine and coaches from the previous evening’s Inverness to Helmsdale. From the condition of the Dunalastair IV 54458 and the presence of cattle flakes on Culrain’s loading bank this suggests the early 1950s.

The middle part of last month was taken up with non-Kyle of Sutherland modelling, however I found time to continue with 54495. I rebuilt the complete upper body of the original low-sided brass tender from a Caley Coaches kit with a taller, scratch nickel silver tank and front end.

54495-scratch-7-161201       54495 with rebuilt tender

The loco and tender are booked into the paint shop for January 2017.

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: