July progress

Posted on August 1, 2016. Filed under: Monthly progress |

A mixed bag of work this last month: station accoutrements, loco improvements and a new south-end-of-layout backscene. It all contributes to this long overdue picture of “The Mails” slowing for the Culrain stop.

Train 13.15 160801
Dunalastair IV 54458 pilots a Black five on “The Mails” through Culrain

And I’ve made a start on 54495’s chassis. The view of 54458’s bogie from the front is acceptable, but there’s a lack of realism from an exhibition view to the side. Consequently, I’ve put more effort into 54495’s bogie to include a representation of the equalising beams and leaf springs.

54495 Scratch 3 160725       Pickersgill bogie laminations

Having now assembled the bogie, I can use it to profile the front frames. The bogie frames sit between the main frames, so the equalising beams sitting under the main frames will determine the profile.

This month I’ll continue to work on 54495 as my first priority.

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: