March progress

Posted on April 1, 2014. Filed under: Monthly progress |

A cold garage this last month spurred me on to complete the new bracket signal and progress the last two of the six extra coaches planned for Kyle of Sutherland’s return to the exhibition circuit as a finished layout.

Coaches 9 140401       LMS coaches in progress

These coaches were all started at Missenden Abbey, the two unpainted Comet models at the recent Spring Railway Modellers Weekend. From the left they are: Pullman Restaurant Car (1955 Wick/Thurso), D1807 Open Third (1955 Helmsdale local), D1755 Brake Composite (1960 Dornoch Branch Mixed), D2161 Brake Third (1955 Helmsdale local) and D1704A Brake Composite (1955 Dornoch Branch Mixed).

The sixth coach is a Highland TPO which still only consists of a scratch floor and some etches. However, the four Comet coaches I’ve worked on have provided some much needed coach building experience.

Before continuing with coaches there’s a long list of garage jobs to do.

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: