January progress

Posted on February 1, 2014. Filed under: Monthly progress |

At long last I assembled the various scenic and building components on the two scenic boards. After replicating as near as possible prototype photographs of Culrain station by Vallance, Sibley and Young I feel confident that the end is in sight. My idea is to use these photo mock-ups to inform the next stages of modelling.

I’m nevertheless amazed by how much more detail is still needed. I guess it’s one of the hazards of modelling a real location? But how long will it be before I post some pictures?

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: