All square?

Posted on January 24, 2014. Filed under: Project progress |

Without a kit, there is no way I could achieve this Highland Railway lattice footbridge for Kyle of Sutherland. But it was a frustrating business, and the end result should not be viewed too closely.

KoS Mk 2 25 140124       Culrain’s HR footbridge

Culrain’s down platform is about fifteen inches higher than the up platform. I supported the main pillars on base plates at the right height, but left the down steps to be buried as was usual on the Highland when platforms were raised.

My difficulty was in aligning the main structural sub-assemblies, such as steps to side girders and steps to landings, and keeping verticals truly vertical. I would rather the kit had no tabs or slots, but supplied good prototype views of the main assembly joints. And if I were to start again, I would definitely re-engineer the stairways. However, this is a worthy addition to the layout and I am indebted to Lochgorm Models for the kit.

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: