Incremental design

Posted on August 8, 2013. Filed under: Project progress |

It’s time I carried out more electrical modifications on the layout, but those twitching servos have got me worried. When I say “twitching servos” I mean the signal servos that twitched throughout Scaleforum 2012 and which I’ve not yet sorted. Something to do with the proximity and alignment of track section feeds and servo control wires.

??????????       Who knows where the wires go?

The cut-out for the Down Home is made and it’s decision time for new wiring. Where to route the electrics to add a new section between the loop point and the south cassettes, the DPDT switch to isolate or feed the new section, two new Fulgurex changeover switches, and those signal servo wires and power switches? It doesn’t help that the signal cut-out is bounded by electrical section feeds on three sides and track on the other.

This is when I wish Kyle of Sutherland were a second layout. I might then have some experience to call on, instead of continually dealing with the consequences of incremental design.

Advertisements

Make a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

    About

    The epic struggle to build a model railway exhibition layout at 4mm to the foot

    RSS

    Subscribe Via RSS

    • Subscribe with Bloglines
    • Add your feed to Newsburst from CNET News.com
    • Subscribe in Google Reader
    • Add to My Yahoo!
    • Subscribe in NewsGator Online
    • The latest comments to all posts in RSS

    Meta

Liked it here?
Why not try sites on the blogroll...

%d bloggers like this: